Projects

The Regional ITS Architecture provides a starting point for project definition. It provides an overall framework that shows how anticipated projects will integrate with each other and with existing systems. This page lists all the ITS projects that have been mapped to the regional ITS architecture.

ProjectStatusTimeframeDescription
CC Rider GPS/Online Tracker SystemFuture Provides real–time bus information for riders, data for monitoring and adjusting service, improves NWConector connectivity
I–5 and SR 432 Fiber InstallationFuture  
ODOT Pavement and Sidewalk Improvement WorkFuture  
ODOT US30 – Queue Warning System (Rainier) for Lewis and Clark BridgeExisting ODOT project to address safety concerns of slow/stopped queues alongside high–speed, downhill flows on US30 eastbound going toward Rainier and WSDOTs Lewis and Clark Bridge. Slow/stopped traffic backs up eastbound on US30 into blind curves creating a safety hazard for eastbound motorists trying to access WSDOTs Lewis and Clark Bridge over the Columbia River, accessing Longview Washington and Interstate 5 include the lane reassignment changes on EB US30 approaching the ramp.
Rainier Transit CenterExisting CC Rider recieved a Connect Oregon grant for the center which, when opened, will have ITS capabilities (transit management and tranist traveler information)
SR4 Ocean Beach HWY Traffic Signal ProjectPlanned2019–2020Upgrade traffic signals from 9th to 32nd Avenues with new controllers, cabinets, detection and communication technology to improve the reliability.